Applications are planned from 2 September to 1 October 2026 under intervention I.10.3 “Investments preventing the spread of ASF”. Support includes the purchase and installation of silos for feed and grain intended for feed. The rules have been simplified in 2026. Silo support is calculated using unit costs and storage capacity.

This is an important change for pig farmers planning investments in the safe storage of feed and feed grain. The new rules reduce the documentation required for investment costs and make it easier to estimate support during the planning stage.

Silo funding in 2026 – key information

The key provisions of the planned application round are:

  • Application period: 2 September–1 October 2026;
  • Programme: intervention I.10.3 “Investments preventing the spread of ASF” under the CAP Strategic Plan 2023–2027;
  • Silo-related scope: silos for feed ready for direct consumption by pigs and silos for grain intended for feed;
  • Cost calculation: unit costs based on silo storage capacity and construction;
  • Simplifications: no requirement to submit quotations from prospective contractors with the support application, no assessment of the justification for silo equipment, and no requirement to submit invoices with the payment claim.

The changes apply to the planned application round starting on 2 September 2026.

Who can receive support for a silo?

Intervention I.10.3 is not a general silo funding programme for all agricultural producers. Its purpose is to prevent the spread of African swine fever (ASF).

Support is intended for farmers keeping or breeding pigs who meet the conditions of this intervention.

For storage investments, support may cover silos intended for:

  • feed ready for direct consumption by pigs;
  • grain intended for feed.

Appropriate storage of feed and feed materials helps limit contact with animals and external factors that could threaten herd safety.

What changes in silo funding in 2026?

One of the main changes is a simplified unit-cost system for investments in the purchase and installation of silos.

In practice, this introduces three important simplifications.

1. Quotations from prospective contractors are not required

Quotations from prospective contractors will not be required when applying for support.

This reduces some of the formalities associated with preparing the investment.

2. No assessment of the justification for silo equipment

According to the Ministry of Agriculture and Rural Development, the assessment of the justification for silo equipment has been removed.

This offers greater flexibility in tailoring the technical solution to actual grain storage and handling requirements.

3. Invoices are not required with the payment claim

For investments settled using unit costs, invoices will not be required when submitting a payment claim.

The amount of silo support is calculated using established unit costs and the silo’s storage capacity.

How should a silo be selected when using funding?

The availability of support does not change one of the key principles of storage infrastructure design: silo capacity should reflect actual requirements, rather than only the available funding level.

Before selecting a solution, determine:

  • how much grain will be stored;
  • the type of material to be stored;
  • how often the silo will be filled and emptied;
  • the required grain conveying capacity;
  • how loading and unloading will take place;
  • whether ventilation and stored-grain monitoring systems are needed;
  • how the new silo will connect to existing infrastructure.

A silo does not operate in isolation from other equipment. Its efficient use also depends on appropriate conveying design and the entire grain reception, storage and dispatch process.

Before choosing a specific model, consider the investment as a single processing line.

A silo is more than storage capacity

Storage capacity is a basic silo parameter, but it is not the only factor affecting how the investment will be used.

Loading and unloading methods, storage condition monitoring, ventilation, service access and compatibility with conveying equipment also matter.

A well-designed installation should enable efficient material flow without bottlenecks between its components.

This is especially important when future expansion is planned. Considering later stages during the design phase can make it easier to increase the capacity or throughput of the entire system.

Why are silos part of biosecurity?

Silos are included in the ASF prevention intervention because appropriate feed storage plays a role in protecting livestock production.

A closed storage system helps limit contact between feed or feed grain and wild animals, birds or rodents.

A silo investment can therefore serve two purposes: improving material storage and supporting biosecurity requirements.

When do silo applications open in 2026?

The planned application period starts on 2 September 2026 and runs until 1 October 2026.

Before applying, interested farmers should check the latest ARiMR documentation and the applicable conditions of intervention I.10.3.

It is also worth determining the required silo capacity and technical assumptions in advance. This allows the solution to be chosen on the basis of actual requirements, rather than only during implementation.

Silo funding in 2026 – FAQ

Can a silo receive funding in 2026?

Yes. Intervention I.10.3 provides support for, among other things, the purchase and installation of silos for feed ready for direct consumption by pigs and silos for grain intended for feed. The intervention’s conditions must be met.

When do applications open?

The planned application period is 2 September–1 October 2026.

Must silo quotations be attached to the application?

Under the new silo rules, quotations from prospective contractors do not have to be submitted with the support application.

Are invoices required with the payment claim?

For silo investments settled using unit costs, invoices do not have to be submitted with the payment claim.

What determines the silo unit cost?

Its storage capacity and whether the silo is supplied with or without a foundation slab.

Does the programme cover every grain silo?

No. Intervention I.10.3 concerns prevention of ASF. Its silo provisions cover specified investments in feed and feed-grain silos and target beneficiaries who meet the programme’s conditions.

Planning a silo investment?

Before selecting a solution, determine both the storage capacity required and the arrangements for grain reception, conveying, loading and dispatch.

UNIA Grains designs and manufactures silos and grain conveying systems that can be configured to suit the investment and existing infrastructure.

If you are planning to build or expand storage infrastructure, discuss the technical assumptions with our team.

Tomasz Waluśkiewicz
Domestic Sales Director

📞 +48 605 434 020
✉️ tomasz.waluskiewicz@uniagroup.com

Jarosław Kukurowski
Farmer Product Line Sales Representative

📞 +48 661 110 793
✉️ jaroslaw.kukurowski@uniagroup.com

Sources: Ministry of Agriculture and Rural Development – current detailed guidelines for intervention I.10.3 “Investments preventing the spread of ASF”, effective from 1 July 2026; Ministry of Agriculture and Rural Development – “Support for silo investments: simplifying procedures”.

Contact
/ Unia Grains

Subject