Since 2018, we have had the privilege of working with Cedrob S.A., the largest poultry and feed producer in Poland. Our long-term cooperation has resulted in the construction of a modern drying and storage facility, which today constitutes a key element of Cedrob’s grain storage infrastructure.
The scope of the investment included a comprehensive technological and construction design, along with full turnkey project delivery.
The project comprised:
storage silos with a total capacity of 52,800 tonnes, including: – 10 × 3,400 t – 10 × 2,000 t – 2 × 500 t – 8 × 300 t – 2 × 30 t
a grain dryer with a capacity of 984 tonnes per day (for wheat),
bucket elevators and chain conveyors with capacities of 200 t/h, 150 t/h and 60 t/h,
two drum cleaners, each with a capacity of 240 t/h (wheat).
Thanks to advanced technological solutions and the extensive experience of our design and execution teams, the project significantly increased Cedrob’s grain drying and storage capabilities. The investment supports production continuity and raw material security, providing a solid foundation for the company’s further development.
preparation of the technological and construction design,
construction of foundations for technological equipment,
supply and installation.